Construction of 2000 living units & service buildings
Upgrade Tagriffet Control Building
Concreting works for Nalut Flow Control Station (NFCS) Regulating Tank
Construction of Reservoir Tanks at Gharyan Water Supply Project
Concreting Works of Pumping Stations 1 and 2
Concreting Works of Pumping Stations 3 and 4
Technical Services to Al-Nahr Company Ltd
Construction of Maintenance workshop at Samah Oilfields for Waha Oil Company
 
Please Scroll down for project descriptions & status
 
Construction of 2000 living units and service buildings
DATE OF CONTRACT: 6 July 2008
CLIENT'S NAME: Housing Infrastructure Board, Tripoli, Libya.
PROJECT VALUE: LD 220,816,000.00
PROJECT LOCATION: AL Khums, Libya
PROJECT DURATION: 27 Months
PROJECT DESCRIPTION: The original project comprised of development of a master plan over an area of 102 hectares along with design and construction of 2000 living units and associated public buildings near the city of Alkhoms, district Almarqab. However on 26 November 2008 the scope of development of master plan increased from 102 hectares to 237 hectares and as per changed requirements a new master plan accommodating 3450 units and associated public buildings has been prepared and submitted. In addition to the housing units urban plan includes service buildings, public buildings, parks and roads. Utilities like water, power and sewerage for the development project are integrated with the regional infrastructure.

Mobilization has been completed at site and client approval for buildings and master plan is awaited to commence work. The work is expected to be completed within the stipulated construction period of 27 month after receipt of design approval and site hand over.
   
 
Upgrade Tagriffet Control Building
DATE OF CONTRACT: 31 August 2009
CLIENT'S NAME: VEBA Oil Operations. (Petro Canada)
PROJECT VALUE: USD 1,380,000.00
PROJECT LOCATION: Ghani Oilfields, Libya
PROJECT DURATION: 5 Months
PROJECT DESCRIPTION: The project comprises of construction of a new control room building with steel portal frame, block walls and sandwich panel roof.

The work also includes design and installation of HVAC system, telephone, electrical, general and emergency lighting, sanitary and waste water system, potable water system, fire water, fire fighting and fire alarm systems.

Work is in progress as per approved schedule.
   
 
Concreting works for Nalut Flow Control Station (NFCS) Regulating Tank
DATE OF CONTRACT: 10 October 2009
CLIENT'S NAME: Al Nahr Company (Fully owned by Great Man-made River Authority)
PROJECT VALUE: USD 70 million
CONSTRUCTION WORK: LD 990,329.000
PROJECT LOCATION: Nalut, Gadames-Zwara-Al Zawiah Water System for Great Man-Made River project, Libya
PROJECT DURATION: 14 Months
PROJECT DESCRIPTION: The work comprises of civil construction of 70,000 cubic meter capacity regulating tank with specialized formwork for columns, walls and roof panels. The work involved about 12678 cubic meters of concrete work and 2100 tons of rebar fabrication and installation.

Work is in progress and is expected to be completed ahead of schedule.
   
 
Construction of Reservoir Tanks at Gharyan Water Supply Project
DATE OF CONTRACT: 5 August 2009
CLIENT'S NAME: Al Nahr Company (Fully owned by Great Man-made River Authority)
PROJECT VALUE: USD 10 million
CONSTRUCTION WORK: LD 370,920.000
PROJECT LOCATION: Gharyan Water Supply Project PH-2, Gharyan, Libya
PROJECT DURATION: 6 Months
PROJECT DESCRIPTION: The work comprises of civil construction of 4 No. reservoir tanks with capacities ranging from 1000 to 3000 cubic meter with specialized formwork for columns, walls and roof panels. The work involved about 3091 cubic meters of concrete work and 500 tons of rebar fabrication and installation.

Work is in progress as per approved schedule.
   
 
Concreting Works of Pumping Stations 1 and 2
DATE OF CONTRACT: 06 October 2008
CLIENT'S NAME: Al Nahr Company (Fully owned by Great Man-made River Authority)
PROJECT VALUE: USD 70 million
CONSTRUCTION WORK: LD 1,586,700.00
PROJECT LOCATION: Gadames, Gadames-Zwara-Al Zawiah Water System for Great Man-Made River project, Libya
PROJECT DURATION: 16 Months
PROJECT DESCRIPTION: The work comprises of civil construction of two 20,000 cubic meter capacity forebay tanks, two pumping stations with electrical buildings, chlorination buildings, feeder tanks, shafts and other appurtenant structures. The work involved about 16738 cubic meters of concrete work and 2500 tons of rebar fabrication and installation.

Both forebay tanks and pumping stations with electrical buildings have been completed ahead of approved schedule. Work on the remaining appurtenant structures is progressing as per approved schedule.
   
 
Concreting Works of Pumping Stations 3 and 4
DATE OF CONTRACT: 25 May 2008
CLIENT'S NAME: Al Nahr Company (Fully owned by Great Man-made River Authority)
PROJECT VALUE: USD 70 million
CONSTRUCTION WORK: LD 1,131,592.000
PROJECT LOCATION: Aljuwaibiyah, Gadames-Zwara-Al Zawiah Water System for Great Man-Made River project, Libya
PROJECT DURATION: 22 Months
PROJECT DESCRIPTION: The work comprises of civil construction of one 20,000 cubic meter capacity forebay tank, two pumping stations with electrical buildings, chlorination buildings, feeder tanks and other appurtenant structures. The work involved about 11333 cubic meters of concrete work and 1900 tons of rebar fabrication and installation.

Work on the last pumping station is in progress as per approved schedule. All the remaining works have been completed ahead of schedule.
   
 
Provision of Technical Services to Al-Nahr Company Ltd.
DATE OF CONTRACT: 2 April 2000
CLIENT'S NAME: Al Nahr Company (Fully owned by Great Man-made River Authority)
PROJECT VALUE: USD 2,400,000.00/ year
PROJECT LOCATION: Brega PCC Plant
PROJECT DURATION: Renewed annually
PROJECT DESCRIPTION: Provision of highly skilled Engineers, Specialists, Plant Operators & Technicians in the Operations, Transportation, Manufacturing departments of the worlds biggest Prestressed Concrete Pipes (PCCP) Fabrication Plant.
   
 
Construction of Maintenance workshop at Samah Oilfields for Waha Oil Company
DATE OF CONTRACT: 5 December 2007
CLIENT'S NAME: Industrial Engineering Company
PROJECT VALUE: LD 1,950,000.00
PROJECT LOCATION: Samah Oilfields, Libya
PROJECT DURATION: 9 Months
PROJECT DESCRIPTION: The scope of work comprised of design and construction of a workshop for welding, AC repair and equipment maintenance with covered area of 3000 sqm. The steel structure consists of 8m high and 20m span portal frames with provision of two gantry cranes of 5 and 10 tons. A mezzanine floor with composite roof construction provides space for storage, facilities and offices.

Being a fast track project, design along with procurement of off shore materials was completed well ahead of construction schedule. Further activities are on hold due to client pending contractual obligations.
   
 
 
 